Basque Storm Drain Improvement
BID DATE
06/26/19 - 2:00
AGENCY
Fullerton
ESTIMATE
$625,000
SCOPE
Storm drain and street improvements including, but not limited to, installation of 18” to 60” RCP storm drain; construction of catch basins, local depressions, PCC collars, storm drain junction structures and manholes; storm drain abandonment; sheeting, shoring and bracing; reconstruction of curb and gutter, access ramps, and sidewalk; coldmill/excavate existing AC pavement, aggregate base, asphalt concrete; water siphon; sewer lateral extension and chimney connection; adjust water valves to grade, adjust manholes to grade; traffic control; clear and grub; water pollution control; and all related work.