Access the Full Project by Clicking here!
Bidjugde
JOB
San Fernando Road Rehabilitation Phase 3 Public Works Yard Recycled Water Main Extension Adjacent S
BID DATE
06/26/19 - 2:00
AGENCY
Glendale
ESTIMATE
n/a
SCOPE
Selective removal/reconstruction/surface grinding of deteriorated pavement and placement of asphalt concrete pavement; • Placement of asphalt rubber hot mix pavement (ARHM) over asphalt leveling course; • Selective removal and repair of broken and damaged sidewalks, curbs, curbs and gutters, driveway approaches, local depressions, and alley aprons • Installation of new curb ramps meeting current Federal ADA requirements; • Removal and planting of new trees and pruning of tree roots; • Adjustment of existing manholes and water meters to finished grade; • Removal and replacement of existing traffic striping and installation of new striping; New sidewalk construction along the west side of Los Angeles Street between San Fernando Road and East Garfield Avenue; and • New storm drain catch basin construction at the south-west corner of Los Angeles Street and East Garfield Avenue and connection to the existing County of Los Angeles Flood Control District storm drain system on Los Angeles Street Construction of approximately 1,600 linear feet of 8-inch PVC recycled water pipeline to serve the Public Works Maintenance Services Yard from San Fernando Road at Los Angeles Street, along Los Angeles Street and East Garfield Avenue to the Public Works Yard, and terminating at the southern portion of the Yard close to Chevy Chase Drive; and • Installation of three backflow prevention devices on existing potable water and fire supply lines servicing the Public Works Corporate Yard and Fire Training Facilities. SMODY@CI.GLENDALE.CA.US
UPDATES