Access the Full Project by Clicking here!
Bidjugde
JOB
Juniper Silt Dams Improvement Plans
BID DATE
06/17/19 - 3:30
AGENCY
Prescott Valley
ESTIMATE
n/a
SCOPE
The project generally consists of the placement of downed Juniper trees and T-post/cable anchors or rock cover at 10 silt dam sites in Yavapai County, on State Land, as shown on the plans. Work includes cutting, hauling and placing Juniper vegetation in existing channels and covering fresh-cut Juniper logs and branches with a mix of 12” and 18” boulders, creating a silt dam from natural materials, or in some locations, placing pre-cut and seasoned or fresh-cut Juniper vegetation in channels and locking in-place with cables and T-posts. The boulders shall be 12” in smallest dimension and 18” in largest dimension as specified in Section 220 of these Special provisions and as shown on the plans. The approximate locations of the silt dams and the staging area has been shown on the construction plans. Additive Alternate: The Additive Alternate generally consists of the placement of downed or fresh cut Juniper trees and T-post/cable anchors at an additional 6 silt dam sites as shown on the plans. Work includes cutting, hauling and placing Juniper vegetation in existing channels and locking in-place with cables and T-posts. No boulder dams are included in the Additive Alternate. Bill Osborne (928) 759-3083 bosborne@pvaz.net
PREBID
6/10/2019 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT