Access the Full Project by Clicking here!
Bidjugde
JOB
Large Potable Water Valve Replacement 2016 Redondo Ave Kilroy
BID DATE
06/25/19 - 12:00
AGENCY
Long Beach
ESTIMATE
$925,000
SCOPE
Site 1: (Intersection of Redondo Avenue and Kilroy Airport Way)The Work shall include but not limited to furnishing all labor, equipment and materials necessary to remove and dispose of existing 24-inch, 30-inch and 42-inch gate valves and steel piping; installation of new 24-inch, 30-inch and 42-inch butterfly valves and CML&C steel piping; installation of a 30-inch line stop and 42-inch line stop with 24-inch bypass; 24-inch hot tap of the 42-inch discharge piping; 24-inch hot tap of 30-inch surge tank piping; installation of a 24-inch bypass line; installation of a 24-inch aboveground highline and flow meter, converter and electrical wiring for power and instrument signals, 12-inch blow-off assemblies and piping; 4-inch chlorination assemblies and piping; pavement restoration; traffic control; removal and replacement of existing shrubs and grass; removal, salvaging and replacement of existing palm tree; and all work necessary to install the new butterfly valves complete in place.Site 2: (Treatment Plant)The Work shall also include but not be limited to furnishing all labor, equipment and materials necessary to remove and dispose of an existing 42-inch electrically actuated butterfly valve and piping in a vault; installation of a new 42-inch electrically actuated butterfly valve and CML&C steel piping; electrical wiring; and all work necessary to install the butterfly valve complete in place. Ms. Carolina Avendano - 562-570-2334 Carolina.Avendano@lbwater.org
PREBID
6/11/2019 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT