Access the Full Project by Clicking here!
Bidjugde
JOB
GLP Lift Station Upgrade
BID DATE
05/30/19 - 3:00
AGENCY
Hollister
ESTIMATE
$499,200
SCOPE
This project involves the construction of the GLP lift Station Upgrade: Construct new 10-foot diameter wetwell and valve vault (outside of roadway), new concrete pad for lift station , new gravity diversion to new wetwell, replace existing discharge piping in (new) wetwell, relocate existing pumps to new wetwell, provide new slide rails, coat existing and new wetwell interiors, remove existing bioxide odor control system, provide new biofiltration odor control system, provide new overflow connecting existing and new wetwells, new vent, new concrete pad in area of existing lift station, new fencing and hammer-head driveway, man gate on south side of lift station, electrical panel relocation (outside of travel way), provide new generator and auto transfer switch, sewer bypassing required during construction asphalt surface removal and repair, excavation, backfill and all other incidental work required to make GLP Lift Station complete and operation. danny.hillstock@hollister.ca.gov
PREBID
5/15/2019 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT