Access the Full Project by Clicking here!
Bidjugde
JOB
14th Street Waterline Relocation
BID DATE
05/31/19 - 2:00
AGENCY
Pittsburg
ESTIMATE
$120,000
SCOPE
The work of this Contract consists in general, the abandonment of an existing 18” ACP in place and the installation of a new 18” C905 PVC (DR 14) potable waterline located in the City Central Park Addition and associated work as shown in the project drawings and as described in the Specifications. The scope of work includes but is not necessarily limited to; furnishing all products and materials associated with the abandonment of the existing 18” ACP, 18” butterfly valves and the installation of the new 18” C905 PVC (DR 14) potable waterline, restrained joints, 18” butterfly valves, connections to the existing pipe system and associated work as shown in the project drawings and as described in the Specifications.