American Gulch Channel Riparian Enhancement (REBID)
BID DATE
08/15/19 - 10:00
AGENCY
Payson
ESTIMATE
n/a
SCOPE
M Anderson Construction - $365,401 This project will construct a more natural, stable bankfull (low flow) channel in the bottom of the existing channel which will include stabilization structures, including rock cross-vane weirs, rock vanes, toe rock, TRM (turf reinforced matt) and larger natural substrate material. This project will improve the aesthetics, and habitat function of the channel while retaining the flood control functions. The new channel shall conform to natural channel design principles as much as practical to improve sediment transport function and the ability of the channel to support appropriate native vegetation. hstanley@paysonaz.gov