Wastewater Treatment Plant No 3 Influent Pipeline Repair
BID DATE
07/2/19 - 11:00
AGENCY
Bakersfield
ESTIMATE
$174,000
SCOPE
The work to be performed consists, in general, of removing and replacing approximately 40 feet of 36-inch and 48-inch cement mortar lined and epoxy coated steel pipe between the headworks and grit chamber at City of Bakersfield Wastewater Treatment Plant No. 3. This pipe is located in the basement of the headworks building with limited access. Temporary bypass of the pipe using existing pumps is necessary. Sameena Gill sgill@bakersfieldcity.us