Temecula Parkway Recycled Water Pipeline Replacement (REBID)
BID DATE
04/30/20 - 2:00
AGENCY
Rancho California WD
ESTIMATE
$5,720,000
SCOPE
Trautwein - $6,716,007 Ferreira Coastal Construction - $7,200,820 Construction of approximately 7,700 LF of 20-inch polyvinyl chloride recycled water pipeline, including appurtenances and connections; construction of approximately 130 LF of steel casing by open trench construction (5 locations); construction of approximately 188 LF of steel casing by bore and jack method (3 locations); removal and disposal of approximately 115 feet of existing 12-inch force main pipe and approximately 418 feet of existing 20-inch cement mortar lined and coated pipe; abandoning in place of approximately 7,700 LF of 20-inch cement mortar lined and coated pipe and appurtenances; traffic control; street restoration; and trench asphalt concrete pavement and asphalt concrete pavement grind and overlay. Rhonda Barkey - 951-296-6984 barkeyr@ranchowater.com