Bryner Ploutz Pipeline
BID DATE
09/14/19 - 5:00
AGENCY
Department Agriculture
ESTIMATE
n/a
SCOPE
This project materially consists of: Tapping into an existing 36" HDPE irrigation pipeline to add a 10" HPDE junction; placing ~770' LF of 10" HDPE pipeline, including one road crossing with multiple utilities; connecting new 10" HDPE pipeline to existing 10" HDPE pipeline; installing all pipeline appurtenances; and constructing a pumping plant with VFD. All work is to be completed summer/early fall 2019 during the irrigation season. Water in the 36" pipeline will be shut off for the minimum duration possible and work should be planned for an expeditious connection to the supply pipeline. aimee.rohner@usda.gov