Access the Full Project by Clicking here!
Bidjugde
JOB
Sepulveda Blvd Rehabilitation Figueroa St Main St
BID DATE
05/30/19 - 10:00
AGENCY
Carson
ESTIMATE
n/a
SCOPE
Furnishing all labor, material, equipment, services, and incidentals required for Trees removal and disposal; Portland Cement Concrete (PCC) improvements removals and replacement; Cold milling full width Asphalt Concrete (AC) surface, 4” in thickness, and Overlay with 2.5” Asphalt Concrete (AC) Base/Leveling course, then, apply 1.5” thick Asphalt Rubberized Hot Mix (ARHM) Finish Course; also includes removal and replacement “Dig-Out” of localized failed 4”AC sections at specified locations, compacting existing CAB Base to min. 95% relative compaction; and reconstruct these sections by laying 4” AC Base Course; then overlay with ARHM Finish Course surface; adjust manhole covers, utilities valve covers to grade; cleaning road surface, installing loop detectors; installation of temporary pavement markers replacing raised markers, applying traffic striping, marking and legends to match existing condition and other related work. Sander Huang - 310-952-1758 shuang@carson.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT