Access the Full Project by Clicking here!
Bidjugde
JOB
Airport Taxiway K Pavement Rehabilitation
BID DATE
06/4/19 - 11:00
AGENCY
Salt Lake
ESTIMATE
n/a
SCOPE
This project is a continuing phase to maintain the Airport’s infrastructure. Taxiway K is showing signs of distress and requires corrective action to avoid further aging and deterioration. The asphalt is cracking and unraveling which is causing exposed aggregate to pop away from the surface. The project will consist of surface preparation and an asphalt overlay to prolong the service life of the Airport’s pavement. This project will remove a nominal 2-inches and replace 3-inches of asphalt pavement over the entire length and width of Taxiway K up to but not including the guard lights. The existing asphalt shoulders will receive a 1-inch overlay. Existing taxiway incandescent edge lights will be removed and replaced with new energy efficient LED lights and the lights will be adjusted to the new grade with new extension rings. Bob Bailey bob.bailey@slcgov.com James Barron james.barron@slcgov.com
PREBID
5/29/2019 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT