Access the Full Project by Clicking here!
Bidjugde
JOB
Northern Blvd Restoration
BID DATE
05/29/19 - 2:00
AGENCY
Rio Rancho
ESTIMATE
n/a
SCOPE
This work consists of the reconstruction of Northern Boulevard pavement starting east of Unser Boulevard to the east of the Montoya’s Arroyo by pulverizing the existing asphalt, processing the pulverized material into the native subgrade, moisture conditioning, compacting and paving a 3” lift of SPIII. Construct a detour on the eastbound shoulder using City of Rio Rancho provided millings. Striping of the new roadway surface and grading the detour to create a ditch for 1160 l.f. to include installation of check dams. Part of additive alternate four will include placement of an asphalt ditch with a cut off wall, as shown within the plans. This project also has two additive alternates on Unser Boulevard; place check dams on the northbound shoulder of Unser Boulevard from the Montoya’s Arroyo to Zapata Road and asphalt patch in the areas shown within the plans. aserna-sanchez@rrnm.gov
PREBID
5/16/2019 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT