Access the Full Project by Clicking here!
Bidjugde
JOB
Williamson Valley Road Safety Improvements Phase 2
BID DATE
05/30/19 - 1:30
AGENCY
Yavapai County
ESTIMATE
$1,512,000
SCOPE
Longview Drive/Buena Vista Trail (base bid) – intersection alignments to remain in their current locations; northbound left turn lane to Buena Vista Trail; northbound right turn to Longview Drive; Southbound left turn lane to Longview Drive; reconstruct WVR 760’+/-- south of Buena Vista for sight distance improvements; and reconstruct designated north bound right turn lane on Longview Drive. Major components include, but are not necessarily limited to: 3,710 CY total roadway excavation (includes cut to fill and export), 462 CY roadway excavation (cut to fill), 3,248 CY export (3,710 CY – 462 CY), 1,936 CY aggregate base material, 1,805 TONS asphaltic concrete, signing and striping, and various other improvements as shown on the construction plans and/or described in these Special Provisions. Cliff Rose Road/Pemberton Drive (additive alternate bid) - realign Pemberton Drive to align with Cliff Rose Road; southbound designated left turn lane to Cliff Rose Road; northbound designated right turn lane to Cliff Rose Road; northbound designated left turn lane to Pemberton Drive; reconstruct WVR 720’+/- to the south for sight distance improvements; slope cut-back, grading, and vegetation removal along WVR; and drainage improvements at Pemberton Drive. Major components include, but are not necessary limited to: 4,109 CY total roadway excavation (includes cut to fill and export), 1,864 CY roadway excavation (cut to fill), 2,245 CY export (4,109 CY – 1,864 CY), 1,572 CY of aggregate base material, 1,552 TONS asphaltic concrete, signing and striping, and various other improvements as shown on the construction plans and/or described in these Special Provisions. All work is to be done in accordance with the plans, specifications, and contract documents. There has been a MANDATORY pre-bid meeting scheduled for 10:00 a.m., Tuesday, May 21, 2019, in the Yavapai County Public Works Conference Room B in Prescott located at 1100 Commerce Drive, Prescott, AZ 86305. Any questions or concerns about the project will be addressed at that time. ENGINEER’S ESTIMATE (base and additive alternate): $1,512,000.00 MaryAn.Sala@co.yavapai.az.us
UPDATES