Access the Full Project by Clicking here!
Bidjugde
JOB
2019 Street Resurfacing - Calabasas
BID DATE
05/29/19 - 2:00
AGENCY
Calabasas
ESTIMATE
n/a
SCOPE
The 2019 STREET RESURFACING PROJECT to be constructed consists of the following streets: 1. Las Virgenes Road between Parkmor Road and Horseshoe Circle 2. Redbluff Drive between Parkmor Road and its terminus 3. Trana Circle between Greenview Road and its terminus 4. Greenview Road/Farmfield Road from its road terminus to 741 feet west 5. Peacock Court between Old Topanga Canyon Road and its terminus 6. Wrencrest Drive between Meadowlark Drive and its terminus 7. Calabasas Road between Park Granada and El Canon Avenue 8. Digouts on Parkway Calabasas and Paseo Primario 9. Digout on Old Topanga Canyon Road and Mulholland Highway 10. Construction of A.C. Berm on Valley View Road and Rosebud Trail micro-milling, reconstruction or repair of city streets and segments in the City of Calabasas. The work includes but not be limited to - saw-cutting; excavation, removal and disposal of the AC roadway section; cold planing and disposal of AC pavement; replacement and compaction of subsurface material; setup and maintenance of temporary traffic control system; placement of crushed miscellaneous base and AC, and ARHM pavement materials; installation of AC berm; replacement of traffic striping and markings; and clean up of the project area; and digout and patching of alligator cracked areas bchan@cityofcalabasas.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT