Pipeline Rehabilitation AQ 1
BID DATE
06/11/19 - 2:00
AGENCY
San Diego
ESTIMATE
$5,300,000
SCOPE
Rehabilitation of approximately 43,011 LF (8.15 miles) of existing 8-inch and 10 inches Vitrified Clay (VC) sewer mains. In addition, all existing sewer laterals will be rehabilitated from the property line to the sewer mains and assessed by CCTV. The project also includes point repair, manhole rehabilitation, manhole repair, manhole replacement, cleanout installation, curb ramp installation, cross Gutter, and street resurfacing. Scope includes preparation of D sized engineered traffic control plans by a registered engineer. All required approvals and associated permits for traffic control is the responsibility of the contractor. Celina Suarez - 619-533-6678 csuarez@sandiego.gov