9th Street Storm Drain Basin
BID DATE
06/4/19 - 11:00
AGENCY
Modesto
ESTIMATE
$1,358,000
SCOPE
The storage basin will alleviate the flooded area on 9th street and will be designed such that to maximize the footprint and the depth to utilize the available space to the maximum possible. A lift station will be also constructed which will transfer water into the existing nearby MID canal Lat. No.4, at a certain water level in the basin. Senior Civil Engineer/Cristian C.Ciotau 9th_Street_Storm_Drain_Basin_Bid_Questions@docs.e-builder.net