Access the Full Project by Clicking here!
Bidjugde
JOB
Sidewalk Replacement Citywide Measure P
BID DATE
05/22/19 - 2:00
AGENCY
Chula Vista
ESTIMATE
$205,000
SCOPE
The scope of work includes the removal and replacement of PCC curb, gutter, sidewalk that pose tripping hazards at various locations throughout the City, along with the removal of trees that have been determined to be the cause of hazards. The scope also includes the removal and replacement of portions of PCC driveways, cross gutter spandrels, root pruning and removal, installation of root barrier, protection and restoration of existing improvements, other miscellaneous work and all labor, material, equipment and transportation necessary for the project. Alan Reyes, 619-407-3588 areyes@chulavistaca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT