Access the Full Project by Clicking here!
Bidjugde
JOB
WRF 3 Sewer Force Main Improvements Temescal Canyon Rd Backbone
BID DATE
05/21/19 - 2:00
AGENCY
Corona
ESTIMATE
n/a
SCOPE
The WRF-3 Sewer Force Main project is a HDPE pipeline project located in Temescal Canyon Road and Cajalco Road. The Contractor is to install approximately 1,895-feet of dual 10-inch HDPE pipe (3,790-feet total). A 120-foot jack and bore with 42-inch steel casing is required to construct the dual HDPE pipe beneath Bedford Wash. 152-feet (304-feet total) of dual 16-inch HDPE casing is required to enclose the 10-inch HDPE carrier pipe crossing Temescal Canyon Road. Approximately 300-feet of 3-inch HDPE conduit and 3 pull boxes for future fiber optics will be constructed as part of this project. Fiber installation will be on a future project and is not part of this contract. All other work involves the restoration of improvements damaged by construction such as asphalt paving, concrete, fencing, landscaping/irrigation, etc. The Temescal Canyon Backbone Project is an electrical conduit and vault system project located in Temescal Canyon Road and Cajalco Road. The Contractor is to install approximately 1,780-feet of 6-inch PVC (set of four) electrical conduit and three 6FT x 12FT x 7FT concrete electric vaults. A retaining wall will be required around the electric vault located on Cajalco Road. The electric conduits will be tied into an existing electric vault on the northerly side of Cajalco Road, approximately 700-feet westerly of Temescal Canyon Road and tie into an existing vault on the westerly side of Temescal Canyon Road and approximately 1100-feet southerly of Cajalco Road. Wire pulling is not part of this contract. The 6-inch conduit will be installed within the same casing that is part of the 120-foot jack and bore construction noted in the WRF-3 Sewer Force Main scope of work. All other work involves the restoration of improvements damaged by construction such as asphalt paving, concrete, fencing, landscaping/irrigation, etc. Holli Clear - 951-279-3535 holli.clear@coronaca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT