Brian Head Transmission Lines
BID DATE
05/14/19 - 2:00
AGENCY
Brian Head
ESTIMATE
n/a
SCOPE
The project includes furnishing and installing approximately 12,225 feet of new 8-inch ductile iron culinary transmission line and appurtenances at two separate locations. The Mountain View Drive Project consists of the installation of 4,570 L.F. of 8-inch ductile iron pipe and the installation of ten fire hydrants, three air/vac assemblies and two pressure reducing stations along the Mountain View Drive. The Salt Pile Tank Transmission Line Project consists of the installation of 7,665 L.F. of 8-inch ductile iron pipe and four air/vac assemblies between 1MG Tank and Salt Pile Tank.