Access the Full Project by Clicking here!
Bidjugde
JOB
La Gross Way Waterline
BID DATE
05/22/19 - 3:30
AGENCY
Simi Valley
ESTIMATE
n/a
SCOPE
The project generally consists of constructing approximately 495 linear feet of 6-inch diameter PVC waterline, including rock excavation, ductile iron fittings, fire hydrant installation, traffic control, potholes and reporting, submittals, sheeting shoring and bracing, restrained joints, thrust blocks, connections to the existing water system, hydrostatic testing, disinfection and bacteria testing, excavation, slurry backfill, concrete and asphalt re-paving, and appurtenant work. Jay Lukiewski (805) 583-6898 jlukiewski@simivalley.org
PREBID
5/9/2019 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT