Access the Full Project by Clicking here!
Bidjugde
JOB
Estrella Park
BID DATE
05/21/19 - 2:00
AGENCY
San Diego County
ESTIMATE
$690,000
SCOPE
Work to be done includes, in general, furnish all labor, equipment and materials for the clearing and grubbing of existing vegetation where nature play area are to be constructed, landscape area and irrigation water lines to be installed, Best Management Practices (BMP’s), install nature play area, wood bridge, site furnishing( picnic tables and trash receptacles), playground signage, flagstone steps, rope railing posts, rope railing ropes, log benches, 1-2 May 21, 2019 Part 1/RFB #9406 boulders, deepened concrete curb at nature play area, Engineered Wood Fiber, concrete drainage crossing, suspension bridge. Install concrete curb and ADA stabilized decomposed granite trails around nature play area, existing grades remain “other than ADA access”, install 18” Reinforced Concrete Pipe, Rip Rap, Timber Check Dams, Play Sand, and bark mulch, irrigation, backflow preventer, controller, valves, pipe, tubing, wire, meter, solar irrigation controller. Install 24”and 5 Gal County supplied trees, install shrubs and groundcover at approximately 36” o.c. with drip irrigation laterals on tree planting
PREBID
5/1/2019 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT