Stafford Kentucky Street Sewer Line Replacement
BID DATE
05/9/19 - 2:00
AGENCY
San Luis Obispo
ESTIMATE
$768,000
SCOPE
In general, this project consists of the abandonment of a segment of existing 6” VCP municipal sanitary sewer line, including a segment underneath the Union Pacific Railroad (UPRR) right-of-way. The abandoned segment will be replaced with new 8” HDPE pipe installed using conventional trench and backfill methods, with the segment beneath the UPRR right-of-way to be installed using jack and bore methods. Other work will include the replacement of an existing 6” VCP segment of sanitary sewer with new 8” HDPE pipe using pipe bursting methods. In addition, there will be installation of new cure-in-place pipe (CIPP) within a multiple segments of existing 6” VCP gravity sewer main and manhole rehabilitation. kstanley@slocity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT