JOB
Sierra Pine Avenue Improvements
BID DATE
05/2/19 - 2:00
AGENCY
Vernon
ESTIMATE
$270,000
SCOPE
This project consists of a 4” deep removal and replacement of the existing asphalt pavement, along with adjustment of manholes and valves to the new grade. New asphalt shall consist of a 2” – B-PG-70-10 (3/4” mix) with an additional 2” latex modified asphalt concrete overlay C2-PG-70-10 (1/2” mix). In addition, the project includes the removal and replacement of damaged sidewalk, driveways, and installation of handicap access ramps. To finalize, the streets shall be repainted according to the latest Caltrans standards as noted on the project plans. Yesenia Ramirez - 323-583-8811 x259 PublicWorksBids@ci.vernon.ca.us