Florence 12 inch Water Line Augmentation Phase 3B
BID DATE
05/30/19 - 3:00
AGENCY
Florence
ESTIMATE
n/a
SCOPE
BID RESULTS FOR PHASE 2: Apache Underground and Excavating - $550,110 In Ground Construction - $605,842 Fishel Co. - $805,668 Scholz Contracting - $819,983 Jonovich Companies, Inc. - $956,779 Redpoint Contracting Action Direct - $1,174,825 Install approximately 2,000 LF of water line improvements in the Town of Florence, Arizona starting immediately north of Butte at Warner Street, crossing Butte Avenue (ADOT ROW) with a directional bore along South San Carlos Street to East Virginia Street then west on East Virginia Street to Park Street. The improvements include replacing 6-inch pipe with 12-inch PVC or DIP pipe and install connections to existing system. Install valves, fire hydrants, tapping sleeves, and concrete encased sewer. Replace curb, sidewalk, asphalt, and customer service lines as necessary
PREBID
5/16/2019 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT