Hyperion Treatment Plant (HTP) Digester Gas Utilization
BID DATE
02/26/14 - 1:00
AGENCY
Los Angeles
ESTIMATE
$3,200,000
SCOPE
At the HTP, install a 72-inch cooling water return line from north of primary battery “A” to the Effluent Pumping Plant wetwell. Install three air vents, one each on “A” Street, ‘B” Street and “9th❠Street. Relocate an existing vault. Rehabilitate five 10,000 gpm existing cooling water pumps located in the Service Water Facility. Richard.Mayer@lacity.org