Access the Full Project by Clicking here!
Bidjugde
JOB
Water Well No 23 Sand Filter Discharge Line
BID DATE
05/21/19 - 2:00
AGENCY
Ceres
ESTIMATE
$275,000
SCOPE
The work to be performed under this contract includes the furnishing of all labor, materials, tools, and equipment for the installation of sand filter unit, flowmeter, gate valves, fittings, underground conduits, concrete work and other such items not mention herein that are required by the project plans and specifications. The project shall be completed in accordance with these Contract Documents and in satisfactory operating condition, to comply with all requirements to allow its use by the Owner for all purposes intended thereby, as shown on the drawings and/or as specified herein.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT