Access the Full Project by Clicking here!
Bidjugde
JOB
Riverwalk Legacy Trail
BID DATE
05/3/19 - 11:00
AGENCY
Grants
ESTIMATE
n/a
SCOPE
The project consists of constructing a multi-purpose trail, pedestrian railing, sidewalk, ADA curb ramps, speed tables, beacons (RFB's), signing and striping, and Traffic Control. The trail is approximately 0.67 miles in length. The trail crosses three main roadways at 2nd Street, 1st Street, and Anderman Street. Donald Jaramillo.
PREBID
4/16/2019 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT