Access the Full Project by Clicking here!
Bidjugde
JOB
Mesquite Lateral Delivery 8 Delivery 9 Concrete Lining
BID DATE
06/10/19 - 2:00
AGENCY
Imperial Irrigation District
ESTIMATE
n/a
SCOPE
The Work shall include but not be limited to importing suitable material from an approved borrow site to the jobsite (FOB jobsite), trenching, concrete lining, final grading, and cleanup. The Contractor shall furnish all safety equipment, tools, and supplies to ensure compliance with design and all OSHA regulations, both State and Federal. Refer to IID drawings for additional details, such as, benchmark temporary relocation and other drawing notes. cjdeanda@iid.com
UPDATES