Access the Full Project by Clicking here!
Bidjugde
JOB
I 5 Metro Air Parkway Interchange
BID DATE
05/23/19 - 2:00
AGENCY
Sacramento County
ESTIMATE
$20,049,200
SCOPE
The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for constructing, in general, a grade-separated interchange on Interstate 5 between the State Route 5/70/99 Separation and the Powerline Road at Interstate 5 overcrossing. Project work includes clearing & grubbing, pavement grinding, pavement removal, tree removal, roadway excavation, erosion control, aggregate base, asphalt pavement, lime stabilization, overhead sign construction, traffic striping, bridge construction, installation of metal beam guard rail and bridge railings, pipe culverts, waterline, ramp metering, lighting, and doing all other work specified on the plans and in the specifications sotht@saccounty.net
UPDATES