JOB
Measure T1 Street Improvements
BID DATE
04/18/19 - 2:00
AGENCY
Berkeley
ESTIMATE
$3,500,000
SCOPE
The work done under these specifications includes but is not limited to: traffic control, adjustment of valve boxes and utility boxes, frames, and covers, protection and relocation of underground utility services (e.g. gas, water, sewer, electrical, telecom), concrete curbs and gutters, sidewalk, curb ramps, driveways, cross drains at curb ramps, storm drain pipe replacement, storm drain inlets, base failure repairs, pavement milling, removal and disposal of pavement surfaces and base materials, subgrade preparation, stabilization and compaction, aggregate base course, hot-mix asphalt (HMA) paving, Rubberized HMA, Full Depth Reclamation (FDR) and pavement markings, striping, and markers as specified. SMuktevi@cityofberkeley.info