Access the Full Project by Clicking here!
Bidjugde
JOB
H804501C (DESIGN BUILD) Nogales Primary Border Grand (NHPP-189-A(201)S) (189-A-(201)A)
BID DATE
02/27/20 - 1:00
AGENCY
ADOT
ESTIMATE
$94,000,000
SCOPE
QUALS DUE 5/8/19, OPEN 11/1/19. DOWNLOAD FULL DOCS HERE> https://www.azdot.gov/business/ContractsandSpecifications/CurrentAdvertisements We uploaded only ad and RFQ. The proposed Design-Build project work is located on SR 189 from approximately ½ mile north of the Mariposa Port of Entry (POE) to Grand Avenue (Business 19). The work includes widening SR 189; constructing fly over ramps, raised medians, modern roundabout, two new bridges, storm drains, retaining walls, concrete barrier, curb and gutter, curb access ramps, sidewalks, driveways, guardrail and metal handrail; signing; pavement markings; traffic signal modifications and new traffic signal construction; intersection and roadway lighting; intelligent transportation system and other related work.
UPDATES