Access the Full Project by Clicking here!
Bidjugde
JOB
Silverbell Road Sidewalk Infill
BID DATE
04/30/19 - 2:00
AGENCY
Marana
ESTIMATE
n/a
SCOPE
The project is generally described as the construction of new and upgraded sidewalk segments, curb access ramps, driveways aprons, and barricade railing situated along the southbound side of Silverbell Road from Silvermoon Way to Wade Road and along a portion of Continental Reserve Loop west of Silverbell Road as well as the construction of upgraded curb ramps at the Silverbell/Somerton Intersection. Depending upon available funding, additional work consisting of the construction of new and upgraded sidewalk segments, curb access ramps, median refuges, and barricade railing situated along the southbound side of Silverbell Road from Wade Road to Cortaro Road and at the Silverbell/Cortaro Intersection as well as the construction of upgraded curb ramps Rudy Torres (520) 382-1983 rtorres@maranaaz.gov
PREBID
4/16/2019 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT