Mill Meadow Dam Rehabilitation
BID DATE
04/16/19 - 2:30
AGENCY
Fremont Irrigation Co
ESTIMATE
n/a
SCOPE
The Bid Schedule is for the installation of a toe drain system at the base of the existing dam; installation of an earth-fill dike to replace the existing spillway; reparation to and installation of an access road along the existing dam structure; installation of a new concrete weir and spillway; installation of a grouted rip rap exit channel from the new spillway; and the realignment of the existing adjacent roadway and portions of an existing water line. Kyle Torgerson