Access the Full Project by Clicking here!
Bidjugde
JOB
Joint Outfall C Unit 4B Trunk Sewer Rehabilitation
BID DATE
05/13/19 - 2:00
AGENCY
Sanitation District Los Angeles
ESTIMATE
$3,700,000
SCOPE
The work consists of rehabilitation of approximately 2,760 feet of 48-inch diameter RCP on the Joint Outfall “C” Unit 4B Trunk Sewer with cured-in-place pipe (CIPP) liners and by sliplining with Fiberglass Reinforced Polymer (FRP) liner pipe, and rehabilitate eight (8) manholes on the Joint Outfall “C” Unit 4B Trunk Sewer with calcium aluminate cement coating and thirteen (13) manholes on the Marina Trunk Sewer Section 1A (Marina 1A) with a cured-in-place fiberglass lining system or epoxy mastic and flexible PVC liner system, and all appurtenant work. The project will also construct approximately 170 feet of 15- and 24-inch diameter VCP airlines on the Long Beach Water Reclamation Plant Interceptor Section 1.
PREBID
4/10/2019 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT