Access the Full Project by Clicking here!
Bidjugde
JOB
Reclaim Pump Station
BID DATE
04/18/19 - 2:00
AGENCY
Heber Valley SSD
ESTIMATE
n/a
SCOPE
Mobilization of the site includes but not limited to equipment, supplies, personnel and clean-up of the site. (ii) The construction of a Pump Station which includes a discharge pipeline to be routed to an existing splitter box. Pumps shall be furnished and installed along with a monorail system. The work includes all civil, mechanical, electrical and structural components as indicated in the Reclaim Pump Station Design Drawings, and further described in the Specifications. (iii) Transitioning the current plants Non-potable-water system to Utility water (using fresh water), with the exception of the existing washpactors located in the headworks building. An air gap tank, booster pumps and necessary yard piping shall be furnished and installed. The work includes all civil, mechanical, electrical and structural components as indicated in the Reclaim Pump Station Design Drawings, and further described in the Specifications. (iv) The existing filter building garage door height shall be increased. The work includes but not limited to structural, mechanical and electrical. Heber Valley Special Service District bradr@aquaeng.com
PREBID
4/4/2019 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT