Access the Full Project by Clicking here!
Bidjugde
JOB
Annual Slurry Seal
BID DATE
04/10/19 - 2:00
AGENCY
Pleasanton
ESTIMATE
$820,000
SCOPE
This work will consist of slurry sealing twenty five (25) city streets with either latex emulsified asphalt or micro-surfacing, utilizing Type II black aggregate. The total project includes approximately 1,700,000 square feet of asphalt pavement area. Work shall consist of furnishing all the labor, materials, equipment, and necessary services for performing a complete project as specified in the plans and specifications. Work will include: placement of slurry seal/micro-surfacing; traffic control and construction area signage; providing and implementing stormwater pollution control plans; removing and replacing existing striping, pavement markers, and pavement markings; cleaning of the job site and other miscellaneous items. Bidder shall notice that although City will execute contract with successed bidder, the slurry seal work will not begin until August 2019. The base preparation work and crack sealing operation for this slurry seal project is being performed by another City project, Resurfacing of Various City Streets, and the start of this slurry seal work will begin after successful completion of base preparation and crack sealing from the resurfacing project. The Notice to Proceed for the slurry seal project will be issued on August 9, 2019. The Engineer’s cost estimate for the project is $820,000. HHo@cityofpleasantonca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT