St. Malo Forcemain Replacement
BID DATE
01/15/14 - 10:00
AGENCY
Oceanside
ESTIMATE
$150,000
SCOPE
1. Replacement of the existing 4” Force Main with a 6” HDPE force main constructed mainly through utilizing Horizontal Direction Drilling construction methods. 2. Modification to the existing St. Malo Ejector station with new slide rail mounted submersible pumps. 3. Construction of new valve vault for new force main with isolation valves, check valves, bypass piping, hatches, etc. 4. New gravity manhole at the point of connection for the new force main 5. Rehabilitation of existing manhole where existing force main terminates. amyczajkowski@parccivil.com