John Muir Parkway Extension Phase II
BID DATE
04/4/19 - 2:00
AGENCY
Brentwood
ESTIMATE
$4,420,000
SCOPE
The Project is located at John Muir Parkway between Briones Valley Road and Concord Avenue, and is described as follows: new construction of John Muir Parkway north of Briones Valley Road (including utilities), and the construction of an access road to the Contra Costa County Flood Control District parcel. Improvements include, but are not limited to, storm drain, sanitary sewer, domestic water, non-potable water, irrigation water, grading, sidewalk, curb, gutter, pavement, signage, striping, landscaping, corrosion protection, joint trench and electroliers, complete and in satisfactory condition, all as shown on the plans and/or as specified herein.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT