Access the Full Project by Clicking here!
Bidjugde
JOB
Doak Blvd Shared Use Path
BID DATE
04/17/19 - 11:00
AGENCY
Ripon
ESTIMATE
$430,000
SCOPE
Installing a 12 foot wide shared-use concrete path along the south side of Doak Blvd. between Vera Ave. and Stockton Ave. Handicap ramps and landscaping the parkway between the path and the curb and gutter is also included. The project also includes the installation of a new waterless restroom facility located south of the intersection of Parallel Ave. and Reynolds Ave.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT