Access the Full Project by Clicking here!
Bidjugde
JOB
FY2019B Pavement Maintenance
BID DATE
04/11/19 - 3:00
AGENCY
Santa Barbara
ESTIMATE
n/a
SCOPE
Repair various streets by performing asphalt dig outs to repair failed areas; tree root pruning; various PCC improvements including but not limited to concrete curb and gutter replacement, sidewalk replacement, spandrel and gross gutter replacement, asphalt cold milling and asphalt hot mix overlay; reconstruction of existing curb ramps with truncated domes; construct new curb ramps adjacent to overlay streets; traffic striping and marking; relocate and protect existing signs and roadway name stamps; perform traffic control, notifications, and postings, complete and in place. Eric Goodall - 805-897-2664 egoodall@santabarbaraca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT