Inglewood Avenue Grant Avenue 190th Street Resurfacing 41100 Flagler Lane 190th Street
BID DATE
03/20/19 - 9:00
AGENCY
Redondo Beach
ESTIMATE
$1,330,000
SCOPE
The work includes asphalt and concrete removals, street construction, driveway and alley approaches, cross gutter and spandrel construction, ADA curb ramp construction, utility adjustment, cross gutter replacement, slot paving, signing and striping, tree removal and installation, seal coating, traffic loop detector installation, and other items per plans and specifications.