JOB
North Redondo Beach Bikeway Improvements
BID DATE
04/18/19 - 9:30
AGENCY
Redondo Beach
ESTIMATE
$780,000
SCOPE
The work includes on-site and off-site demolition; site grading; soil export; concrete sidewalk & walkway; concrete driveway approach; concrete curb and gutter; asphalt patching; parking lot concrete curb, concrete wheel stops, concrete pavers and gravel base; 6” reinforced concrete slab; parking lot and bike path striping; solar lights, footings and grounding; bike rack; salvaged bench and signage installation; pathway concrete header/curb; planter mow curb; landscaping and irrigation system; and other works per plans and specifications. RedondoEngineering@Redondo.org