Access the Full Project by Clicking here!
Bidjugde
JOB
Iron Springs Rd Slope Improvements
BID DATE
01/16/14 - 2:00
AGENCY
Yavapai County
ESTIMATE
$163,000
SCOPE
MANDATORY PREBID! The scope of work for this project includes furnishing all labor, materials, equipment, fixtures, and services required for IRON SPRINGS ROAD SLOPE IMPROVEMENT PROJECT, YAVAPAI COUNTY AZ,; Project #2918127. The scope of work for this project includes grading of three existing ½:1 (H:V) cut-slopes along Iron Springs Road, north of Skull Valley. Yavapai County has recently acquired additional right-of-way width at three locations that will allow the steep slopes to be re-graded to 1½:1 (H:V), in concurrence with the project’s geotechnical report. Additionally, as part of this project, the channel downstream of an existing box culvert crossing near the intersection of Iron Springs Road and Ferguson Valley Road will be regraded and material will be removed to allow for improved hydraulic flow in the watercourse. Additional right-of-way was recently acquired for this channel maintenance work as well. Total quantity of material to be removed at all sites is approximately 7700 CY.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT