Costco Drive Reconstruction
BID DATE
01/14/14 - 4:00
AGENCY
Marana
ESTIMATE
$600,000
SCOPE
Mandatory prebid 1/7/14. pokane@marana.com The project entails the complete reconstruction of Costco Drive and a portion of Horizon Hill Drive (2,036 LF) and approximately 215 LF of Costco Place. The existing roadway surface and sub-base will be removed to a depth of 12.” The subgrade will be scarified, moisture conditioned and re-compacted a minimum of 6”, and a geotextile fabric and geo-grid material will be placed on the subgrade followed by the complete pavement structure with the exception of the final lift. Additional elements of construction will include limited replacement of curb, sidewalk and water meters. The project also includes the replacement/upgrade of existing handicap ramps to meet current ADA specifications.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT