Access the Full Project by Clicking here!
Bidjugde
JOB
Street Rehab Via Pico Plaza Ave Pico Los Molinos St (REBID)
BID DATE
07/2/20 - 2:00
AGENCY
San Clemente
ESTIMATE
$1,650,000
SCOPE
Scope of work includes asphalt and concrete repairs, utility adjustments, installing traffic loops, and striping. Concrete work consists of sidewalk, curb and gutter, curb ramp, and median improvements. The median on Avenida Pico will be shifted to accommodate bike lanes in both directions and the median on Via Pico Plaza will be modified to provide a better left turn clearance. Asphalt work consists of reconstructing Calle De Los Molinos while the remaining streets will consist of asphalt grind and overlay with localized pavement repairs. Chris Tanio - 949-361-6128 tanioc@san-clemente.org
UPDATES