JOB
(PREQUAL) Wheeler Creek Intake Rehabilitation
BID DATE
05/27/19 - 5:00
AGENCY
Ogden
ESTIMATE
n/a
SCOPE
The project will consist of demolishing the old structure/diversion and constructing a new concrete spillway/diversion along with constructing a new 12x20 CMU block access building. New power and communication lines will be laid to the building (5,500 LF). A 16 steel water line pipe will be rehabilitated with a CIPP liner (1,400 LF). To improve access to the structure, a road base access road will also be constructed with a concrete retaining wall on both sides of the road.