Second Lower Feeder PCCP Rehabilitation Reach 2
BID DATE
03/26/19 - 2:00
AGENCY
Metropolitan WD
ESTIMATE
$61,000,000
SCOPE
The work consists of rehabilitation of approximately 24,000 linear feet of prestressed concrete cylinder pipe (PCCP) along the Second Lower Feeder including excavating access portals and removing portions of existing PCCP for pipeline access, transporting and installing Metropolitan-furnished and Contractor-furnished steel liner cylinders and valves, procuring and delivering additional steel liner cylinders for installation by others on a future contract, expanding and welding the steel pipe cylinders, grouting the annular space and applying cement mortar lining, modifying five existing blow-off structures, modifying pipeline appurtenant facilities, disinfecting, restoring site, controlling traffic, abating hazardous materials, and other appurtenant work as specified and shown on the drawings.Specs Desk specsdesk@mwdh2o.com