Access the Full Project by Clicking here!
Bidjugde
JOB
Canyon Road Water Line Extension
BID DATE
04/2/19 - 1:30
AGENCY
Alamogordo
ESTIMATE
n/a
SCOPE
The Work will consist of installing 18-inch C-900 PVC (approximately 690 linear feet) waterline from the south side of McKinley Channel along Canyon Road (parking lot) crossing Washington Avenue, Washington Park, 1st Street, and finally connecting to an existing 18-inch waterline located within the Cemetery. The installation will cross existing utilities (gas, electric lines, fiber optic lines, potable water, reuse water, and sanitary sewer); the existing crossing reuse and potable waterlines will be lowered concurrently with the 18-inch line installation. The sanitary sewer line(s) are expected to be at sufficient depth to avoid potential vertical conflicts. Installation across paved streets and parking lots will require pavement removal and patching, sidewalk removal and replacement, curb and gutter removal and replacement, and concrete median removal and replacement, within the city limits of Alamogordo, New Mexico. cquairoli@ci.alamogordo.nm.us
PREBID
3/13/2019 1:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT