Access the Full Project by Clicking here!
Bidjugde
JOB
Lisa Drive Connectivity
BID DATE
04/10/19 - 2:00
AGENCY
Dona Ana County
ESTIMATE
n/a
SCOPE
includes a combined multi-purpose trail and a storm water control feature. The following items will be included for the Project: CLEARING AND GRUBBING; UNCLASSIFIED EXCAVATION; SUBGRADE PREPARATION; BASE COURSE 6"; PRIME COAT MATERIAL; MISCELLANEOUS PAVING; SWPPP PLAN PREPARATION AND MAINTENANCE; CONCRETE MEDIAN PAVEMENT 4"; TRAFFIC CONTROL MANAGEMENT; MOBILIZATION; PANEL SIGN; STEEL/BASE POST FOR ALUMINUM PANEL SIGNS; TRAFFIC CONTROL DEVICES; RETRO REFLECTORIZED PAINTED PAVEMENT; RETRO REFLECTORIZED PLASTIC PAVEMENT; STAKING; POST CONSTRUCTION PLANS
PREBID
3/26/2019 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT